We helped Danote Fertilizer Ltd with the following

  • DFL Bagging complex lighting works (terminal box installation,LV cableinstallation,termination,lighting poles installation, tower installation, floodlights & accessories installation, conduit installation, cable tray installation and fabrication of steel structures)-2019.
  • DFL Bulk Storage Lighting works.2020
  • DFL Urea Unit lighting works installation (train1& 2).2019
  • DFL Granulation Unit lighting works installation (train1 &2).2018
  • DFL Reformer Unit lighting works installation (train1 &2).2019
  • DFL Ammonia Unit lighting works installation (train1 &2).2018
  • DFL Compressor Unit lighting works installation (train1&2).2019
  • DFL Pneumatic and Impulse tubing works for instrument/control valve/on-off valve (train2)-2020
  • DFL Instrumentation Field device and accessories installation (train 1&2)-2021
  • DFL Instrumentation Cable laying and termination for (Train 1&2).2020
  • DFL Access Control for Central Control room and Substation1,2,3,4&5.-2021
  • DFL Plant Surveillance camera installation works-2021
  • DFL Fire alarm& Gas detectors installation for Process buildings-2020
  • DFL Electrical Cable laying and Termination (train 1&2)-2019
  • DFL water treatment Plant MV cable laying and termination-2019
  • DFL water treatment plant LV panels procurement. -2020
  • DFL MV/LV Panel installation-2020
  • DFL Substations 1,2,3,4 & 5 Battery bank Installations-2021
  • DFL CCR Telecom cable laying, termination, and Telcomdevices installation.2021